

-Abstract (300words)
-Table of content
1.General Introduction
-definition of the notion/concept of modernity (an explanation of the key terms).
-introduction of the topic (what specific topic will be featured?)
-the issue being debated (what specific aspect of the topic will be considered?).
(contextual data/ background information)
2. Elements of Procedure
-Presentation of methodology (the modalities of the debate).
-Choice of the variables (an overview of ways data will be manipulated).
-Possible outcomes (hypothesis)
(statement / description of the issue)
3. Review of Literature
-Past literature (what other authors have said on the topic?)
-Modern Literature (what contemporary authors have said on the topic)
-A comparative reading (a possible comparism of the two)
(dynamics of the anticipated solution,goals and objectives of the investigation)
4. Detailed Analysis
-The actual Process
-Illustrations
-Preliminary results
5. Overall Outcomes
-The Actual results
-Interpretation of Results
-Link to real life
‘strategy/ tecniques/ results
6. Analysis
-Isolated Analysis
-Comparation analysis
-Questions about Alternatives
-Interpretation of results
7. Conclusion
-General Discussion
– Recommendations
8. References
Appendices
NB
with charts, tables etc